Unifiller

Project Overview: 

This was one of the last exterior jobs of the 2015 exterior season. You are looking at Unifiller’s busy manufacturing hall in Delta. First the building was pressure washed. The crew scrubbed down any mildew that was present and thoroughly removed all stains and spores.  Loose, peeling, or flaking paint had to be wire brushed. Finally, all concrete and stucco siding was painted, as well as all garage doors and man doors.

Latest Blog Post

Thursday March 30th 2017
After the non-stop snow and rain, we finally have a sunny day! Hope we could have a sunny summer! Time to paint!